On 4/9/14 07:37, Tudor Girba wrote:
Hi,
I forgot to mention that it would be fantastic if we can find the energy to continue the refactoring of the configuration into Units and Assemblies. If not, we can postpone it until after the release when we move to Pharo 4.
I'm not allowed to do pharo for a couple of months so after that period this is definitively something that I would like to do.
Cheers, Doru
On Thu, Sep 4, 2014 at 7:31 AM, Tudor Girba <tudor@tudorgirba.com mailto:tudor@tudorgirba.com> wrote:
Hi, We will have a Moose 5.0 release soon (ideally this month). What is left to do is: - Integrate PP-Islands (Jan? :)) - Migrate relevant visualizations from Roassal1 to Roassal2 - Drop Roassal1 and GraphET1 from the configuration (the packages will still be loadable, only not supported anymore) Are there other topics we should be aware of? Cheers, Doru -- www.tudorgirba.com <http://www.tudorgirba.com> "Every thing has its own flow"
-- www.tudorgirba.com http://www.tudorgirba.com
"Every thing has its own flow"
Moose-dev mailing list Moose-dev@iam.unibe.ch https://www.iam.unibe.ch/mailman/listinfo/moose-dev