Hi,
Pease keep the 5.0 job on jenkins for some time so that downstream projects can move at their own pace and convenience.
tx.
usman
On Thu, Sep 4, 2014 at 7:31 AM, Tudor Girba tudor@tudorgirba.com wrote:
Hi,
We will have a Moose 5.0 release soon (ideally this month). What is left to do is:
- Integrate PP-Islands (Jan? :))
- Migrate relevant visualizations from Roassal1 to Roassal2
- Drop Roassal1 and GraphET1 from the configuration (the packages will
still be loadable, only not supported anymore)
Are there other topics we should be aware of?
Cheers, Doru
-- www.tudorgirba.com
"Every thing has its own flow"
Moose-dev mailing list Moose-dev@iam.unibe.ch https://www.iam.unibe.ch/mailman/listinfo/moose-dev