On Fri, Jun 21, 2013 at 11:07 PM, Stéphane Ducasse < stephane.ducasse@inria.fr> wrote:
On Jun 21, 2013, at 12:36 PM, Guillermo Polito guillermopolito@gmail.com wrote:
Exactly what I neeed!! :D
not really except if the release of 4.8 freeze the packages. Normally it should work with my little moose reloader app.
We can create a version of moose config for 4.8 at the time of release. We did something similar for 4.7 on pharo 1.4 and it worked ok but never used.
Stef
On Fri, Jun 21, 2013 at 12:34 PM, Tudor Girba tudor@tudorgirba.comwrote:
Hi,
As soon as all tests are green, we will release 4.8. The target would be end of next week at the latest.
Afterwards, we move to Moose 5.0 on top of Pharo 3.0.
Cheers, Doru
-- www.tudorgirba.com
"Every thing has its own flow"
Moose-dev mailing list Moose-dev@iam.unibe.ch https://www.iam.unibe.ch/mailman/listinfo/moose-dev
Moose-dev mailing list Moose-dev@iam.unibe.ch https://www.iam.unibe.ch/mailman/listinfo/moose-dev
Moose-dev mailing list Moose-dev@iam.unibe.ch https://www.iam.unibe.ch/mailman/listinfo/moose-dev